From: route@monster.com
Sent: Friday, April 15, 2016 10:20 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Deonte Finch Dfinch2099@gmail.com C: 562-221-4746 OBJECTIVE To Install, Test, and maintain mobile networks, Mounting and Bracing,
Termination of Power, Data, and Radio Frequency Cables… evaluating cell site
installations including connections and equipment condition; monitoring cell
site status; performing daily, weekly, and monthly maintenance routines;
changing cards... Employment History Olympia Entertainment 09/2014-07/2015 Stagehand ·
Load
and unload props and materials from trucks. ·
Set
up lighting, props, and microphones. ·
Move
and rearrange furniture. ·
Unload
and set up road cases. ·
Set
up risers and musical equipment. ·
Ensure
props are affixed properly. ·
Dismantle
scenery and other set pieces. ·
Hand
the scenery up into the roof and lower it down on stage. ·
Work
with electricians and lighting assistants. ·
Set
up lights and microphones. . ·
Help
carpenters build and install scenery. ·
Operate
scenery-moving machinery. ETak Systems/Verizon,
CA
06/2014-09/2014 RF Engineer ·
Converted
AC to DC ·
Measured
Voltage ·
Running and
terminating new power leads ·
Installed
new Power Plants ·
Harvested
Batteries ·
Installed
Diplexers ·
Ran and
terminated fiber optic cables ·
Analyzed
Spectrum and Waveform ·
Ran and
terminated new RF cables to hatch plate ·
Testing and
troubleshooting existing and new RF ·
Operated
CMW500 ·
Made and
terminated T1 alarm cables ·
Tested RF
on GSM and LTE Parsons/AT&T, MI
04/2013-08/2013 Field Engineer § Alcatel-Lucent 3G Installer/Integrator for AT&T § Worked on indoor and outdoor Node B § Nokia Flexi Commissioned 80 sites § Installed Sec-B Kits § Ran T1 cables § Installed RJ-45s § Installed power lugs and terminated to the cabinet § Commission Node B and perform call test § Calibrate and test RF Tangent/Quanta Wireless/T-Mobile, NJ
07/2012-11/2012 Field Engineer § ASP Lead for T-Mobile Modernization Project § Ran and terminated fiber optic cables § Power Upgrades 3106 cabinets to 6131 cabinets § 4A/B, 1B, & 2C Configurations § Commissioning and Integrating DUs § Call testing and MLTR verifying § Directing Tower Crews managing site construction § Sending Daily Tracker and AMS Reports Tangent/WNG/AT&T, Pittsburgh
PA
03/2012-07/2012 Field Engineer
§ UMTS & LTE project for AT&T on Ericsson
Equipment § Smart Laptop Integrations on LTE and UMTS § Ran and terminated fiber optic cables § LTE Installation and Integration 6000 Series § LTE 6000 Series and UMTS 3000 Series alarm block punch
downs § 1st, 2nd, 3rd,4th Carrier add on UMTS, Installation and Integration § 2nd Carrier kit installation. PSU adds § Mounting Ericsson RRUWs & RRUs indoor and outdoor § 1st, 2nd, 3rd, 4th Carrier call testing § BBU Testing and Troubleshooting § Submit daily AMS reports Ericsson/US Cellular,
Milwaukee
WI
05/2011-02/2012 Field Engineer § LTE project for US Cingular on Ericsson Equipment.§ Ran, tested, and terminated T-1s § Power and Ground ran and terminated § Ran and terminated fiber optic cables. § CSR 7705 installation and integration, indoor and outdoor § E Node B installation and integration, indoor and outdoor § Ran Cat5 Cables § Quality Check/ Site surveys § Made connectors for GPS jumpers § Used Spirent testers § Sweep tested RF jumpers with Anritsu gear § Troubleshoot to clear alarms with tower crews § Daily DAM Tool and written reports with pictures on what
was done to the sites A1 Source Group/ATT, Little Rock,
AR
09/2009-03/2011 Field Engineer § Project for AT&T on Ericsson equipment § Installation of 3106 and 3206, 2ND Carrier
add on, and PSU adds § T-1 Testing, Sweep Testing’s, Call Testing § Install Surge Arrestors, Run T1’S lines, installed BBU
(Battery Back Ups), § Terminated Batteries § Integration, Commission § LMC delivery from delivery truck plus crane to drop
cabinets § QA § WCDMA § Deployed 2G UMTS § Made connectors for RF jumpers § Ran Cat5 Cables § Ran RF jumpers § Power and Ground ran and terminated § Daily and weekly written and picture reports MBI/T-MOBILE/ERICSSON, Baltimore
MD
08/2007-08/2009 Field Engineer § Project for T-mobile on Ericsson § QA/QC/UMTS/GSM § Node B Project/ T1 Testing § E911 Call Testing § WCDMA § Install/ Integrate /Commission 3206/3208 § Power and Ground ran and terminated § Installed Radios to Nokia GSM Equip. Ericsson/AT&T Telecommunications, Washington,
DC
04/2006-07/2007 Technician § ENI- Engineering Network
International
§ Project for AT&T on Ericsson equipment § Create/Install 2nd T-1 connections § PCN EDGE upgrades/UMTS § Tested Power with Anite § Installation of E-Pron for CCU (Climate Control Unit) § Installation of ASU’s (Antennae Sharing Unit) O2 Wireless Solutions, Detroit, MI
01/2006-03/2006 Field Engineer · Project for Ericsson Equipment·
Installation
of CDMA radios ·
Installation
of cabinets, CDPD, and testing ·
De-installation
of TDMA equipment ·
Radio Field
Engineer ·
Installation
of FM, AM, UHF, and cellular equipment. Education: BAKER COLLEGE ASSOCIATES In Marketing- 2006 CPR CERTIFIED OSHA 10 CERTIFED
AT&T Ask Yourself AT&T Best Methods of Procedure AT&T Quality Instillations for TP&E:
Part 1-8 AT&T Supplier Awareness- Network Space AT&T Quality Installations NPE Commscope Das 5 Step Ericsson Basic Installation Technique Ericsson TMO L1900 Installation Ericsson T-Mobile L700 RBS Installation Ericsson T-Mobile DUL to DUS Modernization Ericsson WCDMA (UMTS) RBS Commissioning Ericsson LTE Commissioning Ericsson SRS User Training Ericsson SRS Troubleshooting Ericsson LTE 3rd Carrier Modernization Ericsson T-Mobile Nokia Standards Ericsson T-Mobile NSB SBA Carolina Course Ericsson T-Mobile Multi Standard Solution Ericsson/ATT Vast Training Ericsson Telecom Basics Ericsson Smart Laptop Radio Testing Ericsson Project Management Course Ericsson Auto Call Test Application for UMTSLTE
Course Ericsson Best Practices to Pre-Deployment Ericsson Smart Laptop Call Testing LTE 2nd Carrier Add Ericsson Smart Laptop Overview Integration Ericsson Smart Laptop CBU to DUW training Ericsson Smart Laptop Introduction Ericsson Welcome Session Ericsson Quality Assurance Tool Overview Ericsson NRO Tools Overview for CMs Ericsson CM Onboarding Pre-Exam Ericsson CM Onboarding Final Exam Ericsson Construction Field Manual Ericsson CAM Compliance Ericsson Clarity Continuus for Service Providers Ericsson LMS Training for Suppliers Ericsson Clarity Continuus Fundamentals Ericsson EAMS Training Ericsson XMU 03 Overview Ericsson mRBS Swap Overview Ericsson T-Mobile Air 21-Air 32 Swap Ericsson AT&T Centralized Close Out Package Ericsson Verizon Air 21-Air 32 Swap Ericsson ATT DUL to DUS Modernization ASP Ericsson ATT Cisco SIAD Training Ericsson Network Integration Reporting Tool NIRT Ericsson RBS Installation Quality Checklist
Training Ericsson P37 Training Ericsson Test ILT Ericsson Virtual Punch Walk VPW Overview Ericsson Verizon RRUL-RRUS Swap Overview Ericsson CAM OSP for Mobile Suppliers Ericsson CAM OSP for PC Suppliers Ericsson Site Handler Overview FSO-SP Ericsson Sprint 65 Mhz Smart Laptop Ericsson VOLTE Call Test Ericsson OMT IDB Overview Ericsson Verizon DUL to DUS Modernization Ericsson T-Mobile NSN L700 Flexi MR Upgrade Ericsson Test DS Ericsson Construction Quality Ericsson Wireless Overview Ericsson Small Cells Overview mRBS pRBS for SPs Ericsson Small Cells Overview mRBS pRBS for ASPs Ericsson Enhanced Auto Call Test E-ACT Overview Ericsson Construction Testing Ericsson Construction Installation Ericsson Construction Safety References:Donald
Johnson:469-216-4737 Joe Hickox:862-210-0985 Joshua Dickerson:201-455-4711 Curtis Jackson:740-210-0985 Page 1
of 7 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|